The table above shows the distribution of twenty wind projects. If the average power capacity per wind project in Colorado was 275 megawatts and they operated for 36 hours at maximum capacity, what is the total energy, in megawatt-hours, produced by all Colorado wind projects?
550
4,950
9,900
19,800