A construction crew is pouring concrete for a foundation. The volume of concrete needed, , in cubic yards, must be at least cubic yards and at most cubic yards. If concrete is delivered in trucks that each hold cubic yards, what is the minimum number of full trucks that must be ordered to ensure enough concrete is available for the foundation?