John can build a wall in 10 hours. Maria can build the same wall in 15 hours. Ethan can build the same wall in 12 hours. If John, Maria, and Ethan work together to build the wall and take a 3-hour break for lunch, what is the total time, in hours, required for them to complete the job, including lunch?
6 hours
6.5 hours
7 hours
7.5 hours
8 hours